Structural strengthening to the Library, Administration block and tower (completed February 2014) and Block G (completed Jan 2016). The project has been completed while the school was fully operational.
The project consisted of demolishing existing structures and supporting with temporary propping. Hand digging beneath existing floors to provide ground beams & pads. Erecting concrete masonry reinforced sheer walls, inserting additional structural steel and improving connections of existing steel.
42 Lucknow Rd,
Havelock North